NewsMore
01-26
2022
HTR-PM Connected to GridOn December 20, 2021, the High Temperature Gas-cooled Reactor - Pebble-Bed Module (HTR-PM) Demonstration Plant at the Shidaowan site in Shandong Province was connected to the grid for the first time. The plant integrates two reactor modules with one 210 MWe turbine which implies that HTR-PM completes grid connection module by module. After the grid connection of the fir...
NoticeMore
AdmissionMore
Link