1960 | INET was founded. |
1964 | The experimental Shielding Reactor was put into operation. |
1966 | New technology for reprocessing irradiated nuclear fuels by solvent extraction was successfully developed. |
1989 | The 5MW Nuclear Heating Reactor was put into operation. |
1995 | Construction of the 10MW High Temperature Gas-Cooled Reactor started. |
1996 | R&D of separation treatment of High Level Liquid Waste (HLLW) was successful. |
1999 | The 60Co Container Inspection System was set up. |
2000 | The 10MW High Temperature Gas-Cooled Reactor reached its criticality. |
2003 | The 10MW High Temperature Gas-Cooled Reactor reached its full power operation and began to supply power to the grid. |
2004 | HTR-PM standard design was started jointly by INET and CHINERGY. |
2006 | HTR-PM Project was listed in the National Guideline on Medium- and Long-Term Program for Science and Technology Development (2006-2020). |
2006 | Huaneng Shandong Shidaowan Nuclear Power Co., Ltd, the HTR-PM owner company, was established jointly invested by China Huaneng Group, Nuclear Industry Construction Group and Tsinghua University. |
2008 | The State Research Center for Nuclear Power Technology was set up ,focusing on R&D of key technologies applied to large-scale advanced pressurized water reactor (PWR) nuclear power plant and based in INET of Tsinghua University. |
2009 | The cornerstone laying ceremony of the Laboratory of Advanced Reactor Engineering was held at INET, which marked the beginning of the construction of the national key project research base. |
2012 | HTR-PM first concrete dumping. |